Daily maintenance
For constant, localized accumulation zones.
- An operator prepares the mixture each morning and the system dispenses it automatically all day.
- Operator service 1 to 3 times a week: a backpack round applying the product and collecting floating waste.
- Typically 1 to 3 units cover the critical zones of a marina.
